At long last, the frame of my motocross YZ450fm is finally finished and ready for assembly. this one takes about 8 hours to assemble (one hour a day and about 8 days to complete).
.jpg)
The left side of the frame with the remote of the TV on the back.
.jpg)
Right side of the frame and still the TV remote at the back.. hehehehe...
.jpg)
Still the right side but the engine is mounted in its proper place.
.jpg)
Front left side of the frame including the engine.
Soon, I will post the finish product as it ready for assembly and just waiting for me to have time. May be a week or two, my first paper craft will soon be finished and with the way it looks now, I am sure that I will be very satisfied with its outcome.
No comments:
Post a Comment